Compact Biomass Gasification Power GenerationSystem Solutions
(Biowatt 100 & Biowatt 300& Biowatt 500 & Biowatt 1000)
The Biowatt 100 & Biowatt 300 & Biowatt 500 & Biowatt 1000 biomass gasification system is built into multiple skid-mounted container-type frames, easy to ship and fast to install.
The Biowatt 100 & Biowatt 300 & Biowatt 500 & Biowatt 1000 complete system is built into multiple skid-mounted container-type frames that make transportation installation simple.This means that equipment is fully tested in the factory before arriving at site, minimizing commissioning time.
Easy to operate and transport, the system can be unloaded from the truck and installed rapidly for quick operation.
No need of factory building, on-site installation only takes within 7-10 working days.